MTR JCDecaux Phase 1
The Hong Kong MTR is regarded as one of the world’s leading metro systems with an average passenger capacity of 3.4 million per weekday. The rail network MTR operates comprises of nine railway lines serving both urban and suburb areas in Hong Kong. In addition to the railway operation, MTR Corporation also involved in property development projects, property leasing, and revenue from advertising, telecommunication services and international consultancy services. The scope of the Corporation’s business has expanded into the Mainland of China, Asia, Australia, the Middle East and Europe.

MTR Digital Escalator Crown is the first digital and animated escalator advertising platform in Asia’s metro system. Passengers can enjoy a story-telling advertising experience when travelling along the escalator. The high-definition screens and high-impact content impresses every pair of eyes passing by.
Five pairs of escalator banks in 3 busiest MTR stations, with a total of more than 130 screens were in this first phase of the development plan. The project requires all screens to be managed and monitored from a couple of editor sites through the corporate media network. The screens in each escalator bank have to run in synchronized mode such that all the content in the screens are playing coherently.

Suggested solution
DISE solution offers a central content management and distribution mechanism. The corporate administration and design office can manage the complete advertising network from a single access location. The player stations running on “Replay” are always playing synchronously across the series of screens alongside the escalator bank. The powerful and yet easy-to-use “Composer” enable content designer to develop creative advertising on a huge virtual ‘canvas’ covering the entire screen group. Staging and movement of both graphical and audio materials are arranged in the project definition and rendered on-the-fly - Last minute adjustment is possible as designer no longer rely on lengthily pre-produced video for each final screens.

Installation /Rollout
Sure Well Consultants Ltd in Hong Kong proposed the DISE solution and is in-charged for the complete software consultation and installation. The project team has gone through a careful system design based on the DISE building blocks. Thanks for the flexible software design, most of the design challenges can be tackled by simply a tweak in the software configuration. On top of the DISE software architecture, the system has to interface with a few external sub-systems like escalator operation mode sensor and screen remote management port. Long system operation hours are also expected throughout the station daily operation. And the system is required to operate in a harsh public environment exposing to heat and dust.
The first pair of escalator bank has launched on Aug 13, 2008 at Causeway Bay MTR Station. DISE key management members were invited to the opening ceremony. Press and media across regions also witnessed the launch. Please refer to the following link for detail information about the ceremony:
http://www.jcdecaux.com.hk/documents/news/ Digital_Escalator_Crown_Bank_Launch_Ceremony_Summary.pdf
The other 4 pairs of escalator banks are in schedule and the whole project is targeted to complete by end of October 2008.

Surewell / Dise Asia group gathered at the installation ceremony
Quotes
“It is innovative, encouraging advertisers to be even more creative and sure to stir the imagination of our passengers,”
Ms Stella Kwan, Senior Manager -
Media Business of the MTR Corporation
“DISE has been the most reliable and flexible digital signage software for enterprise-class solution. Their responsive and reliable support is the key to every project’s success!”
Mr Falcon Tam, Technical Director –
Sure Well Consultants Limited
see the system in operation on youtube
http://www.youtube.com/watch?v=nVy3KwTwhb4
http://www.youtube.com/watch?v=k6bhbHnx0jQ











